China Harzone Industry Corp.,Ltd
|
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Light Mountain Mechanized Bridge / Emergency Bridge For Plain and Paddy Field Area
Light Mountain Bridge is mainly used to erect an emergency bridge for all sorts of artilleries and vehicles to get across streams, trenches, ditches, craters or other obstacles not wider than 20.5m.
It can be used in plateau (with boost engine and oil adapted), mountain area, plain and paddy field area.
Specification for Light Mountain Bridge |
|
Folded outline dimension (L*W*H) |
10960*3200*3640mm |
Gross weight |
21.8t |
Tracked load / Axle load |
22t / 10t |
Bridge weight |
6.5t |
Bridge length |
22.5m |
Negotiating width (on hard banks) |
20.5m |
Section length |
7.5m |
Roadway width |
3.2m |
Track girder width |
1.16m |
Erection / Retrieval time |
10/10 mim |
Max. twist in erection |
±5% |
Allowable bank height difference |
2.0m |
Operator |
3 operators |