China Harzone Industry Corp.,Ltd
|
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Flexibility 51m Large - Span Mechanized / Emergency Bridges / Single Suspension Bridge
Description:
51m Large-Span Mechanized Bridge is a set of mechanized bridge with large single span carried by vehicle. One complete set of equipment consists of one erection vehicle and six transport vehicles with bridge bays, which can be assembled into an emergency bridge quickly to ensure all sorts of vehicles to go across rapidly.
51m Large-Span Mechanized Bridge possesses the feature of good flexibility, big single span, simple structure, speedy erection, high mechanization and less manpower. Besides, it has the advantages of convenient transportation and favorable adaptability of bank.
Specification: |
Curb weight of erection vehicle (including 3 men) 32.5t |
Curb weight of transport vehicle 20.8t |
Bridge bay weight: 9.2t |
Design load: tracked load LD-60 |
Wheeled (load on axle) LT-20 |
Erection length 17m, 25.5m, 34 m, 42.5 m, 51 m |
Erection width 4m |
Erection time (complete bridge) 75min |
Retrieval time (complete bridge) 75min |
Operator 6~7 men (not including drivers of transport vehicles) |